Concept

Pavement — where it appears

A tiled floor drawn in perspective, which is the standard measuring instrument of the Renaissance construction and of this collection. Its transversals divide depth at a rate a reader can check, so a correctly drawn one turns a picture into a ruler and a wrongly spaced one depicts a different room.

Named by 6 essays across 3 fields — each of them below, with the objects they name alongside it.

horizoncorrect from 21 cm, at 160 mm wide8 bays · worst departure 8e-13 px

The bay repeated by a straightedge

Draw one bay, then repeat it by diagonals alone — no measurement, no scale, no arithmetic — and after twelve bays the constructed corners sit 1e-12 px from the corners the camera projects. It is exact because the operation being iterated is a homology of the picture, not because the draughtsman was careful, and that separates it from every construction in this site's `wrong` field.

construction · Repeatbay
21 of 36 tiles still countablethe floor starts 18 m away

Counting is a measurement

A tiled floor gives its area with no reference length at all — count the tiles and multiply. The count is an integer, so it is exact wherever it can be made, which is a completely different error law from the rectifier's smooth decay. And the distance at which it fails is set by the tile's depth edge, which foreshortens as one over the depth squared, so 18.7 m for a 62 cm tile, where the across edge alone would have allowed 217.

metrology · Area
horizon12.6180339887498954.618033988749895to the measuring point, 0.70 widths offcorrect from 19 cm, at 160 mm wide3 bays · 6e-14 px

The bays that are not equal

The diagonal repeats a bay exactly and forever, and what it reaches is the whole multiples of that bay and nothing else. An arcade of 1:1.5:2 is 250 mm short of its boundary with no halving, exact after one, and an arcade of 1:1.333:2 is out of reach at every depth whatever. A measuring point lays out all three to 6e-14 px.

construction · Repeatbay
the picture plane, in planto the observer, 208 px further downcorrect from 12 cm, at 160 mm widestation 520 px

Two rules for one pavement

Vignola set out two rules for laying a tiled floor and asserted that they agree. Executed from the same ground line and the same free parameter they agree to 2e-13 px; executed from the numbers their own wordings invite they part by 24 px. The quantity that separates them is the distance the reader has to stand at, and neither rule names it.

construction · Tworules
correct from 14 cm, at 160 mm wide12×12 cells · worst 1.57 px

Copying square by square

The taught grid workflow sets a pavement's cell corners out exactly and then fills each cell by eye, and the corners are right while the fill is not — 3.30 px on a picture 690 across at eight cells, falling as the square of the cell. On a wall square to the camera the same fill reads 3e-13 px, which is why the method feels reliable.

construction · Gridcopy
0.050.10.20.5125105101520braccia in the pavement, drawn to one page widthpixelsthe diagonal, by straightedgethe transversals, by fittingboth read on one pavement47× at eight braccia

The rule is exact for a floor that lengthens

The constant-ratio rule for spacing receding boards is an exact perspective — to the last digit, on the panel's own horizon — of a floor whose boards grow by the inverse of the ratio, 0.74 braccia deep at the front and 1.31 at the back on an eight-braccio pavement. The orthogonals agree with that floor. What says the tiles were meant to be square is a diagonal, which bends 8.1 pixels off straight where the reader's fitting test finds a sixth of one.

wrong · Taughtratio

Named alongside it

The objects these essays reach for when they reach for this one.

Vanishing pointCross-ratioDistance pointForeshorteningHarmonic conjugateHorizonMeasuring pointProjective mapTransversalViewing distanceAffine mapArea scale

All concepts