The measuring point, and the step the method leaves out
Laying out equal depths correctly needs a second vanishing point that most treatments never introduce — the one belonging to the diagonals. With it the construction lands on the projected divisions to eighty femtopixels. Without it, depth is placed by judgement and the drawing depicts something nobody chose.
rung 3 · construction